Inviato da Dimitri.Shammas il Ven, 29/12/2017 - 15:45
I applied the loads of (snow, wind, quake) on the building and I used the SAP2000 to calculating the moments of beams and I checked the results using the excel file
Inviato da Dimitri.Shammas il Lun, 11/12/2017 - 12:50
I have designed a building from 4 floors and I dimensioned the beams, the shelfs and the pillars of that building using the excel schedule form. That for the materials of wood, steel and the reinforced concrete.
Inviato da Dimitri.Shammas il Gio, 16/11/2017 - 15:56
I designed a wire steel mesh barrier using the module (2x2x2) meter to cover an area 12x16 m2 of a building of two floors under the barrier, I used the Sap2000 program to do calculations in order to define the proper sections for the steel beams of the mesh.