Esecitazione2_2

I applied the loads of (snow, wind, quake) on the building and I used the SAP2000 to calculating the moments of beams and I checked the results using the excel file

ESERCITAZIONE 2

I have designed a building from 4 floors and I dimensioned the beams, the shelfs and the pillars of that building using the excel schedule form. That for the materials of wood, steel and the reinforced concrete. 

Esercitazione 1

I designed a wire steel mesh barrier using the module (2x2x2) meter to cover an area 12x16 m2 of a building of two floors under the barrier, I used the Sap2000 program to do calculations in order to define the proper sections for the steel beams of the mesh.